36 orders, 8,429 m inspected
Indication rate per 1,000 m of weld, first-pass order rate and accepted-indication ratio, aggregated by product family from our 2024–2025 inspection records. Order numbers and customer names are not published; only family-level totals.
| Product family | Orders | Weld (m) | Inspected (m) | Indications / 1,000 m | First-pass orders | Accepted indications |
|---|---|---|---|---|---|---|
| Heavy structural steel | 11 | 7588 | 3187 | 18.2 | 54.5% | 91.4% |
| Vacuum chambers | 9 | 2966 | 2966 | 9.8 | 77.8% | 93.1% |
| Scaffolding and access | 8 | 2833 | 1558 | 10.3 | 62.5% | 81.2% |
| CNC machined parts | 8 | 717 | 717 | 11.2 | 87.5% | 87.5% |
Indication = any discontinuity recorded during VT / UT / PT under the order ITP. “Accepted” = share of recorded indications that met the acceptance level without repair. “First-pass” = orders with no repair required. Figures are aggregate; order-level records stay with the quality department and are released under NDA.
How the numbers are produced
- One row per released order: weld length from the weld map, inspected length from the NDT report, indications from the inspector’s record, rework hours from the production log.
- Inspected length is not 100% coverage: on EN 1090-2 EXC3 work only the agreed NDT sample counts here, while visual inspection covers every weld.
- No indication is counted twice: a repair is re-inspected and booked to the original order, so the rate cannot be improved by repairing the same joint twice.
What the table does not tell you
A low indication rate can mean a clean workshop or a weak inspection sample. Read the columns together with the sampling rules on the inspection and documentation page and with the execution class each family is made to. If your ITP specifies a different acceptance level or a larger sample, the comparable number is produced at contract review, not here.
Certificate holders, NDT personnel and the standards behind these families are on the certificate register. A sample qualification pack is here.